top of page

McDonalds Hitchin Handover


Latest handover for DRC happened this week at McDonalds Hitchin.

Our first job for this new client and we were severely tested at every turn. Sheet piling installed around the footprint of the building to facilitate an extended drive through. All associated groundworks to kerbing, drainage and perimeter fencing. Along with a full resurface and new elements to tarmac.

We then added three new structural extensions to the building, Managers Office, Crew room and kitchen. As well as a new roof.

All works carried out within six weeks.

A huge learning curve that should stand us in good stead going forward. Excellent work from all of the team as always. Looking forward to more in the future.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page